The new high school for 325 students is located on 2.62 acres and includes 15 classrooms, a new multi-purpose building/dining area, an administration building, child development center and a 12,000-SF gymnasium. The new facility exceeds over 52,000 SF and consists of a new 38,000-SF two-story classroom building. The classroom building was constructed with fire-proofed structural steel, metal studs and fill on deck. The school was built in phases to allow the existing high school to remain fully functional during construction.






